Neotron-Pico Stage 2 Evidence Consistency Packet

Verdicts: HUMAN_ENGINEERING_REVIEW_REQUIRED, REVIEW_TARGETS_FOUND, INSUFFICIENT_EVIDENCE

Packet authorizes execution: false

Substantive signoff claims: none.

Review Artifacts

These files are the bounded evidence record for this packet. They support review and replay; they do not establish electrical correctness, fabrication readiness, or release authorization.

TargetReasonConfidenceWhy it exists
NTP-ST2-001DOCUMENTATION_DRIFT_REVIEWDIRECT_EVIDENCEDocumentation changed or was added across the pinned revision pair; review should confirm that board/configuration assumptions referenced by docs remain synchronized.
NTP-ST2-002CHANGED_ARTIFACT_WITHOUT_CORROBORATING_EVIDENCEINFERRED_WITH_SUPPORTThe board file and multiple schematic files changed, while generated BOM/fabrication/DRC-ERC evidence is explicitly absent from Stage 1.
NTP-ST2-003BOARD_CONFIGURATION_MAPPING_REVIEWINFERRED_WITH_SUPPORTThe BMC schematic changed and Stage 1 records a configuration-to-BMC relationship; review should check whether configuration evidence is intentionally unchanged or separately corroborated.
NTP-ST2-004GENERATED_OUTPUT_PRESENCE_REVIEWDIRECT_EVIDENCEStage 1 records KiBot configuration for generated output classes, but generated BOM/Gerber/drill outputs were not reproduced or bundled.
NTP-ST2-005IDENTIFIER_MAPPING_AMBIGUITYAMBIGUOUS_MAPPINGMany KiCad schematic artifacts changed, but Stage 1 uses bounded text extraction rather than a complete KiCad semantic parser, so object-level identity is not force-resolved.
NTP-ST2-006MISSING_EVIDENCE_REVIEWMISSING_EVIDENCEStage 1 explicitly lists missing generated outputs, DRC/ERC reports, firmware pin-level analysis, and external engineer review; these gaps bound what the packet may claim.
NTP-ST2-007CONTEXT_PROFILE_DEPENDENT_REVIEWINFERRED_WITH_SUPPORTAssembly documentation was added in the candidate revision; interpretation of board evidence depends on assembly/build context not evaluated by Stage 2.